All case studies
Case / 01 · Enterprise AI · Heavy Industry

The CEO Cockpit

A unified enterprise-AI command center for a $6B aluminum producer — collapsing twelve weekly board packs into a single, real-time decision surface.

Reporting Latency ↓
70%
Asset Base
$6B
Time to Production
9 wks
Context

The C-suite consumed twelve disconnected reports — production, energy, treasury, ESG — assembled by analysts across three time zones. Decision latency had stretched to a week, and material plant events were being discussed in retrospect rather than acted upon.

Approach
  1. Mapped the eleven systems of record feeding the existing board pack and ranked them by signal-to-noise.
  2. Designed a single semantic layer with a domain-specific data model, exposed through a chat-native operator interface.
  3. Wired retrieval over twenty years of plant telemetry, treasury positions, and counterparty exposures with evals at every join.
  4. Shipped to four named executives in a closed beta with a weekly cadence review — escalated to the full ExCo at week nine.
Outcome
  • Board pack assembly time dropped from 38 hours to under 11.
  • First-time correct answers on factual treasury questions reached 96% (eval-set).
  • Two material counterparty exposures surfaced in week three that the prior reporting cycle would have missed.